top of page

PROJECTS estimated

The Aria 
The Electrical budget was $1.6 million.  Aria is one of the area’s most luxurious condominium developments.  Two twelve-storey towers are joined by a stepped four-to-seven-storey building, comprising 174 mixed suites in all.  

Residential

Commercial

The Uptown Mall
The Electrical budget was $1.4 million.  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Engineering/Computer Science (ECS)

The Electrical budget was $2.3 million.  The UVic Engineering & Computer Science (ECS) building is a leading-edge structure, designed by Terrence Williams.  At 95,000 sq.ft., the six-storey high-tech building is striving for LEED (Leadership in Energy & Environmental Design) Gold accreditation. 

Institutional

The Q Centre Arena
The Electrical budget was $770,000.  The Q Centre Arena is a 50,000 sq. ft. bowl design, has 2,300 seats and houses year-round events for hockey and lacrosse. This premier spectator facility can hold any type of event, from trade shows to major sporting and entertainment events.

Recreational

bottom of page